Etlingera Farms
  • The Story   The Story
    • Who
    • What
    • When
    • Where
      • Zurqui Tunnel
    • Why
  • StructuresStructures
    • Little Barn
    • Big Barn
    • El Rancho
    • La Chanchera
    • El Vivero
    • Casa Amarilla
    • La Cochera
    • La Bodega
    • La Casita
    • La Cabina
    • The Stilt House
  • FeaturesFeatures
    • La Quebrada
    • Los Lagos
    • La Selva
    • El Bosque
    • Los Arboles
    • Las Flores
    • Los Animales
    • Las Aves
    • El Bananero
    • El Rio
    • Etlingera elatior
  • ActivitiesActivities
    • Las Subastas
    • Puerto Limón
    • La Feria
    • Guápiles
    • National Parks
      • Tortuguero
      • Parque Nacional Braulio Carrillo
      • Turrialba
    • Vistas Del Turrialba
    • Food
  • Tico InformationTico Information
    • Institute of Tourism
    • Automercado
    • Grupo Ice
    • Grupo Colono
    • El Colono
    • PriceSmart
    • Los Diamantes Experimental Stations Zona Tropical
    • Mega Super Supermarkets
    • Hotel Country Club Suerre
    • Minae
  • ParticularsParticulars
    • Utilities
    • Property Description
    • Los Planos
    • Catastrado
    • Sales Information

The Zurqui Tunnel

To get to the road to Bella Vista, you get to pass through the Zurquí Tunnel.  This tunnel was built by Kier International Limited at a cost of 190 million colones. It measures 12 meters wide, 10 meters tall, and 600 meters long.  Work began on March 16, 1983 and opened on 14 September 1984.  Back then, the exchange rate was rising rapidly with an 8 to 12 colones per dollar exchange rate.  With the completion of this tunnel, big rig trucks were able to transport goods back and forth between San José and the seaport cities Moin and Limón.  The tunnel is built on Costa Rica's Route 32 which bisects the Brauilo Carrillo National Park.  The completion of this tunnel simplified commerce and as a consequence, has improved the quality of life in Costa Rica.

 


Back to Top

© 2025 Etlingera Farms